Transcript
00:04This video demonstrates the termination process for SC and LC Proclick fiber optic connectors.
00:10It is imperative to follow all safety guidelines for materials tools and equipment.
00:15When working with optical fibers, safety glasses are a basic requirement.
00:20When working with optical fiber cleaved fiber scrap can be a hazard,
00:24wear safety glasses and discard glass fiber scrap in the appropriate safety container.
00:30It is recommended that you do not have open drinks or food.
00:33In proximity of the fiber splicing workbench use an approved container for collecting loose
00:39fibers Hubble pro click connectors are factory terminated with a mechanical connection feature.
00:45No field polishing is required making this a labor saving product terminating the pro click
00:52LC and SC connectors follows the same procedure.
00:56This procedure requires a fiber strip tool, a precision cleave tool,
01:01a visual fault locator fiber cleaning solvent, lint, free wipes and a fiber disposal container.
01:08Precision fiber tools must be clean and free of contamination.
01:12The fiber strip tool removes the tight buffer and acrylate coatings down to just the glass
01:18fiber for best results use a precision cleave tool to control fiber cleave angle.
01:24A visual fault locator is used to check termination quality.
01:27This step is optional for the skilled installer for cleaning.
01:31Optical fibers use lit free wipes and high grade cleaning solvent like 99% iso alcohol
01:38use an approved container for collecting loose fibers.
01:42Now let's get started with terminating a pro click sc connector.
01:46Each connector contains the boot and connector with attached spring clamp slide the boot onto
01:52the fiber strand before terminating, strip the field fiber by removing a quarter inch of tight
01:58buffer material at a time to a total strip length of 1 to 1.5 inches strip.
02:04The acrylic coating from the fiber using the 250 micron section of the strip,
02:09clean the fiber with a wipe and cleaning fluid.
02:12Place the field fiber into the cleaver clip so that the tight buffer jacket extends to the end
02:18of the clip. As shown here, place the fiber into the cleave
02:21tool and align with a 10 millimeter mark. All pro click connectors use a 10 millimeter
02:27Cleve length. This is a critical parameter,
02:29close the clamps and actuate the cleave tool, open the clamps and remove the cleaved fiber.
02:38Press the connector firmly to see the actuator clip.
02:41This opens the internal fiber clamp, then flip the safety latch to unlock the clip.
02:47Insert the cleaved fiber until it bottoms out inside the connector.
02:51Hold the fiber gently about two inches away with a slight bow in the fiber.
02:56Be careful. Too much force can break the fiber holding a
03:00steady force on the fiber squeeze and remove the actuator clip.
03:05The fiber is now clamped in place, slide the boot onto the connector to finish the
03:10termination. Termination quality is verified with a VFL
03:14insert the connector and view the splice slots for light.
03:18A good splice shows a little or no visual light shown a bad mating will illuminate the slot
03:25significantly.
03:26Contact your local Hubble premise wiring representative for additional product
03:31information Hubble fiber hub, pro click connectors are a high quality,
03:35fast and reliable option for file termination for your projects.
