Winsted, Connecticut
Hubbell Power Systems, Inc. (HPS) facility in Winsted, Connecticut is home to the Electric Motion Company (EMC) brand. With over 200,000 square feet, the facility houses 230 employees. Production processes include casting, machining, metal fab, metal forming and metal finishing. EMC was acquired by HPS in 2016.